Each procedure, each and every segment, each function in EPG is demanded to be carried out a single phase following one more, carefully and cautiously, from substance choice, reformation to manufacturing equipment, from parts heat therapy to computerized assembly, from top quality management to product inspection and tests and from purchase working to after sales service. With EPG manufacturer registered in more than 70 nations like America , Europe , Japan and so on, it has companions amid entire world prime enterprises, this sort of as JOHNDEERE, NEW HOLLAND, CLAAS, HONDA, KUBOTA, YANMAR, and many others. Our solution variety also addresses locking assemblies (clamping elements/locking device), taper bushes, QD bushes, bolt-on hubs, torque limiters, shaft collars, motor bases and motor slides, chain detachers, chain guides, universal joint, rod ends and yokes.
RV sequence Worm Geared EPT Traits
- RV – Measurements:030-040-050-063-075-105-a hundred and ten-130-one hundred fifty
- Enter Alternatives: with enter shaft, With Square flange,With Input Flange
- Enter EPT .06 to eleven kW
- RV-Dimension from 030 to a hundred and five in die-forged aluminium alloy budy and above one hundred ten in solid iron
- Ratios amongst 5 and a hundred
- Max torque 1550 N.m and admissible output radial hundreds max 8771 N
- Aluminium units are equipped comprehensive with artificial oil and let for EPT mounting positions, with no want to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading capacity in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimensions 030 and above are painted with RAL 5571 blue
- Worm EPT EPTs are obtainable with diffferent mixtures: NMRV NMRV, NMRVEPT NMRV, JWB NMRV
- NMRV, NRV VS,NMRV AS,NMRV VS,NMRV F
- Options: torque arm, output flange, viton oil seals, low/substantial temperature oil filling/drain/breather/amount plug.
EPT Travel
ZheJiang EPT Drive Co.,Ltd,the predecessor was a point out-owned military mould EPTrprise, was estabEPTd in 1965. EPT EPTizes in the complete EPT EPT resolution for large-stop gear manufacturing EPT dependent on the aim of quotPlatform Item, Software Layout and Expert Service quot.
EPT have a powerful complex drive with over 350 employees at current, incXiHu (West Lake) Dis.Hu (West Lake) Dis. more than thirty engineering specialists, thirty high quality inspectors, masking an spot of 80000 square meters and sorts of EPT processing EPTs and testing equipments. We have a excellent foundation for the market application deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and service of large-conclude velocity EPTs amp variators proudly owning to the provincial engineering EPT analysis cEPTr,the lab of EPT velocity EPTs, and the base of present day R ampD.
Our Group
EPT Handle
EPT:Insist on EPTrovement,Strive for Excellence With the deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment of equipment producing indurstry,consumer never satirsfy with the present top quality of our merchandise,on the contrary,wEPT the benefit of top quality.
EPT plan:to increase the total degree in the discipline of EPT EPT
EPT Check out:Ongoing EPTrovement , pursuit of excellence
EPT Philosophy:EPT EPTs worth
3. Incoming EPT Control
To create the AQL suitable level of incoming content control, to provide the substance for the EPT inspection, sampling, immunity. On the acceptance of certified merchandise to warehousing, substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd products to just take return, check out, rework, rework inspection liable for tracking bad, to keep track of the provider to get corrective
measures to avert recurrence.
four. Approach EPT Control
The production website of the 1st assessment, inspection and last inspection, sampling in accordance to the needs of some assignments, judging the high quality alter pattern
discovered abnormal phenomenon of producing, and supervise the manufacturing department to enhance, get rid of the irregular phenomenon or condition.
five. FQC(Last QC)
After the manufacturing division will complete the item, stand in the customer’s placement on the concluded merchandise good quality verification, in order to ensure the top quality of
client expectations and wants.
6. OQC(Outgoing QC)
Following the product sample inspection to deterEPT the experienced, allowing storage, but when the concluded merchandise from the warehouse before the formal delivery of the products, there is a examine, this is named the cargo inspection.Check content:In the warehouse storage and transfer standing to validate, even though confirming the supply of the
solution is a item inspection to deterEPT the certified products.
7. Certification.
EPT
Shipping and delivery